project overview
a complex renovation. a carefully planned solution.
Renovating an existing commercial swimming pool requires careful planning, particularly when major hydraulic and filtration changes must be incorporated into an established facility.
At Taradale Community Pool, our team worked within the constraints of the existing structure and plant room to deliver significant infrastructure upgrades, with all major works scheduled within a seven-week Christmas shutdown.
Taradale Community Pool |
|
Taradale, Hawkes Bay |
|
2024-2025 |
|
Commercial pool renovation |
|
Existing concrete pool |
|
Wet-edge overflow, balance tank, filtration and hydraulic systems |
-

the challenge
big ambitions. limited space.
Taradale Community Pool required a significant upgrade to its ageing circulation and filtration systems to better accommodate the demands of learn-to-swim programmes and school swimming.
The existing pool relied on just two skimmers and two return jets for circulation, while the filtration and pumping equipment needed replacing. Improving water movement and treatment performance was essential, but the existing concrete pool structure and restricted plant room presented considerable challenges.
With the project relying on external funding, every decision needed to balance performance, cost and long-term reliability. Modifications to the pool shell also needed to be kept to a minimum.
Adding to the complexity was a strict seven-week construction window over Christmas. The pool needed to be ready for its scheduled reopening, leaving little room for delays or unexpected complications.
- outdated circulation & filtration - the existing system needed substantial upgrades to support the pool's operational demands and improve water treatment performance.
- restricted space & existing infrastructure - the design needed to accommodate a limited plant room, minimise changes to the concrete pool shell and work around existing infrastructure.
- budget & programme constraints - external funding requirements and a seven-week shutdown demanded careful planning, cost-conscious decisions and efficient project delivery.
-
the taylor-made solution
innovative thinking. engineered solutions.
Our team developed a customised solution to significantly improve circulation and filtration while preserving the integrity of the existing concrete pool.
A new approach to circulation
Rather than cutting down the original pool shell, we raised the pool level by 125mm using prefabricated concrete plinths to create a new wet-edge overflow system. A custom balance tank was installed in the car park, with just one 150mm penetration required through the existing pool shell. This approach minimised structural modifications while allowing for a substantial improvement in water circulation.
A complete filtration upgrade
The outdated filtration system was replaced with two large media filters, each measuring 1400mm in diameter and 1.9m high, filled with glass filtration media. A new 5.5kW variable-speed pump was installed, designed to deliver more than 30 litres per second of flow into the wet edge while allowing efficient operation according to the pool's requirements.
Overcoming installation challenges
The restricted plant room presented one of the project's biggest challenges. With just 20mm clearance around the filters and no crane access, nine team members manually manoeuvred each filter into position before loading approximately 2,500kg of glass media by hand. During excavation, unexpected solid concrete plinths were discovered, requiring our team to redesign the pipework and pump layout while maintaining access for future operation and maintenance.
Through careful planning, practical problem-solving and specialist expertise, we delivered a system tailored to the unique requirements of the existing facility.
-
behind the build
from concept to completion
With a tight construction programme and an ageing facility to work around, every stage of the Taradale Community Pool renovation required careful coordination. From developing the hydraulic solution through to commissioning the finished pool, our team adapted to unexpected challenges while keeping the project on track.

Site assessment
On site visit to determine the issue and develop a solution that would significantly improve circulation while minimising changes to the existing pool shell.

Designing the overflow
The pool was raised by 125mm using prefabricated concrete plinths to create a new wet-edge overflow, with a custom balance tank designed and installed in the car park.

upgrading the plant
The outdated filtration system was replaced with two media filters and a 5.5kW variable-speed pump designed to deliver the required flow efficiently.

Adapting to challenges
Unexpected challenges, including hidden concrete plinths and earthquake damage to the pool, required rapid adjustments and repairs to keep the project moving.

Repainting the pool
The pool was professionally repainted with new swim lane lines applied to complete the transformation.

Commissioning & reopening
The completed system was commissioned, tested and brought into operation ready for the community to return to swimming and learn-to-swim programmes.
-
the result
a renewed pool. built for the future.
Despite an extremely tight construction window and an unexpected earthquake that caused cracking to the pool during the project, the upgrade was completed within the original timeframe. The team quickly identified the damage, drained the pool, completed the necessary repairs and refilled it, ensuring the project stayed on schedule.
The new wet-edge overflow, balance tank, filtration and variable-speed pumping system dramatically improved the pool's circulation, water quality and efficiency. Replacing the previous hazardous DE filtration system with glass media also created a safer, more sustainable and easier-to-manage solution for the pool operators.
The result is a modern, high-performance community pool designed to support increased daily use for years to come. The quality and innovation of the project were recognised with Gold Awards in both the Commercial Renovation and Commercial System categories, recognising the design, engineering and execution of the completed upgrade.
Most importantly, the facility was ready to reopen on schedule, providing the local community with a reliable and efficient home for learn-to-swim programmes, school swimming and community use.
-
LET'S WORK TOGETHER
complex projects. proven expertise.
Every commercial pool presents its own challenges. Whether you're planning a major renovation, upgrading ageing filtration equipment or looking for a tailored aquatic solution, our experienced team can help.
From initial planning through to installation and commissioning, we bring the technical knowledge and practical experience needed to deliver results.