project overview
more than a new liner. a complete upgrade.
The renovation of Hastings Intermediate's swimming pool involved much more than replacing its ageing surface.
Taylors Pools & Spas installed a custom Aqualux vinyl liner, refurbished the existing pool weir and upgraded the filtration, pumping and automated water treatment systems.
When concealed plumbing leaks were discovered during the project, our team carried out further investigation and repairs, ensuring the finished renovation addressed the underlying issues as well as the visible condition of the pool.
Hastings Intermediate School |
|
Hastings, Hawkes Bay |
|
2026 |
|
School pool renovation |
|
Concrete swimming pool |
|
Custom Aqualux vinyl liner, T-Loc clipping system, new filter media, automated dosing system, leak repairs and new 40mm return pipework |
-

the challenge
hidden problems. unexpected complications.
Hastings Intermediate's ageing swimming pool required a substantial renovation, with deteriorating surfaces, outdated fittings and pool equipment in need of upgrading.
However, the greatest challenge emerged after the new vinyl liner had already been installed. Unexpected leaks within the original plumbing meant the liner had to be removed so the underlying problems could be properly investigated.
With much of the existing pipework concealed within the concrete structure, specialist plumbers were brought in to inspect the original lines using a camera and help identify the source of the leaks.
The existing return jets also needed to be removed and sealed, with new penetrations and pipework installed to create a more reliable circulation system.
What began as a planned pool refurbishment became a more complex renovation, requiring careful problem-solving and changes to the original scope before the project could be completed.
-
the taylor-made solution
finding the problem. delivering the solution.
When unexpected plumbing leaks were discovered, our team adapted the renovation plan to address the underlying issues rather than simply completing the surface refurbishment. Working alongside specialist plumbers, we investigated the concealed pipework, identified the problem areas and carried out the necessary repairs. The original return jets were sealed, with new penetrations and return pipework installed to provide a more reliable circulation system.
Once the plumbing issues were resolved, the custom Aqualux vinyl liner was reinstalled using our T-Loc clipping system and protective panel padding, creating a fresh, watertight finish within the existing concrete structure. The renovation also included refurbishment of the pool weir, new glass media in the three existing filters, a new 2HP pump and an EMEC automatic dosing system for chlorine and pH control. Two new stainless steel ladders completed the upgrade.
By addressing both the visible deterioration and the hidden problems beneath the surface, we delivered a comprehensive renovation designed to support the school's ongoing swimming programme.
-
behind the build
six stages. one complete transformation.
From removing the ageing fittings to investigating unexpected plumbing leaks, the Hastings Intermediate renovation required careful planning, specialist workmanship and the flexibility to overcome challenges along the way.

Strip Out & Install Clipping
Remove the existing handrails and pool fittings, then install the T-Loc clipping system around the pool perimeter and waterline of the weir in preparation for the new liner.

Prepare, Measure & Paint
Water blast and prepare the existing concrete pool, take accurate measurements for the custom liner, and refurbish the weir with two coats of Luxapool epoxy resin paint.

Install Panel Pad & Liner
Fit protective panel padding to the pool walls and floor before installing the custom-made 0.75mm light blue Aqualux vinyl liner using the new clipping system.

Investigate & Repair Plumbing
Investigate unexpected leaks discovered after the initial liner installation, working with specialist plumbers to identify the issues, seal the original return jets and install new return pipework.

upgrade plant & re-install liner
Replace the filtration media in the three existing filters, install a new 2HP pump and EMEC automatic dosing system, then reinstall the liner and fit two new stainless steel ladders.

Commission & handover
Fill the renovated pool, test and commission the upgraded filtration and water treatment systems, and complete the final site clean-up before handing the facility back to the school.
-
the result
a renewed pool, ready for the next chapter.
Hastings Intermediate's swimming pool has been transformed with a new custom Aqualux vinyl liner, refurbished weir and upgraded filtration and automated water treatment systems. Importantly, the renovation also resolved unexpected leaks within the original plumbing, addressing issues that could have compromised the long-term performance of the pool.
With new return pipework, updated equipment and stainless steel ladders, the completed facility provides the school with a refreshed swimming environment designed for reliable ongoing operation.
-
LET'S WORK TOGETHER
complex challenges. practical solutions.
Every school pool presents its own challenges. From ageing surfaces and hidden leaks to outdated filtration and water treatment systems, our team has the experience to identify problems and deliver practical, long-term solutions.
Whether your school needs a new vinyl liner, equipment upgrades or a complete pool renovation, Taylors Pools & Spas can help you plan the right solution for your facility and budget.